
OPP-MK-01 · Mojkovac
Žarski ski resort
- Public budget
- €29.5M
- Altitude
- 1,650–1,720 m

OPP-MK-02 · Mojkovac · Guide section 6.3.3
Status Planning parameters confirmed in DUP Podbišće I; land disposal, infrastructure and investor-selection package not yet confirmed
Tara River canyon
Eight state plots with direct Tara River frontage, planned for low-intensity tourism: organised camping, glamping or eco-lodges, outdoor learning, sport and food. Close to the Žarski resort and the new motorway.
Mojkovac sits on the Tara River in the northern adventure-tourism corridor, close to the Žarski ski resort and on the route of the new motorway. The Tara is Montenegro's best-known rafting river, and the riverside plots in Podbišće have direct frontage onto it.
The plan sets out a low-intensity concept: organised camping, glamping or eco-lodges, outdoor learning, sport, and food and visitor services, with a larger leisure attraction possible only if studies support it. This suits camping and outdoor-hospitality specialists, youth and education travel operators, or a consortium that combines accommodation with guided activities.
The planning parameters are set, but the land disposal process, infrastructure delivery and investor selection have not been confirmed. Expect to work closely with the municipality on sequencing.
| Plot | Designation | Area | Allowed |
|---|---|---|---|
| UP16-02, 03, 06, 07 | T3 organised camps and resorts | — | Camping, eco-lodge or glamping accommodation |
| UP16-01, 04, 05, 11 (11 is also printed as 011) | U food and beverage and visitor services | — | Limited lodging possible; a water park only if hydrological, environmental, utility and market studies support it |
An environmentally responsible riverside cluster: organised camping, glamping or eco-lodges, active-holiday and outdoor-learning programmes, sport and local food.
Camping, glamping, eco-resort or outdoor-hospitality developers; youth, family, educational or sports tourism operators; consortia with local food operators.
Long-term lease under the state-property framework, or a PPP where there is a demonstrated public interest. A master developer may suit the largest parcel and shared infrastructure, with smaller parcels as coordinated lots.
We collect the planning documents, parcel data and the right contacts at the Ministry of Tourism, the Montenegrin Investment Agency and the municipality, and run those conversations in parallel with you.
We reply within one business day. Prefer email? Write to hello@montenegroinvest.com.

OPP-MK-01 · Mojkovac
Listing does not confirm title, planning readiness, permitting status, commercial feasibility or availability.